Decking In Caulfield

Decking Experts

Reliable Melbourne Carpenters Delivering Quality Workmanship for Residential, Commercial & Insurance Repair Projects.

A deck is the only carpentry your family actually sits on, and in Melbourne it takes the worst of the weather while it does it. StickBuild Construction builds and repairs timber and composite decks across Melbourne's south-east, from a small rear deck off a Caulfield bungalow to a raised entertaining deck with steps and a compliant balustrade. We install treated pine, merbau, spotted gum and composite boards, and we give you an honest read on which one suits your site rather than the one with the best margin on it. The parts you never see decide how long it lasts, so joists go in at 450mm centres, bearers and posts are H3 and H4 treated where they need to be, and posts sit in galvanised stirrups on poured footings rather than buried in soil. We also replace individual boards and repair subframes, because most sagging decks are a problem confined to a few members rather than a rebuild. Free site visit the same day you call, itemised quote, carpenter on site within three days. Call 0468 347 781.

GET A FREE QUOTE

StickBuild Construction

The Four Decking Boards Worth Considering in Melbourne

 Windows & Doors

Most decking decisions in Melbourne come down to four options, and each one is right for a different owner. Treated pine is the cheapest to buy, takes paint well, and suits low decks and tight budgets, but it dents easily and it needs coating to look like anything. Merbau is the default hardwood across Melbourne's south-east, and with regular oiling it will give you ten years and considerably more, which is why it sits on more back decks around Bentleigh and Carnegie than everything else combined. Spotted gum is denser and harder, holds its colour longer, and is the upgrade to make if you can spend more at the start. Composite boards remove oiling from your life entirely and will not rot, split or splinter, at the cost of a higher up-front price and noticeably more heat underfoot in direct afternoon sun. StickBuild Construction installs all four, along with the steps, screening and balustrade that turn a platform into a usable outdoor room, and we will tell you which board we would put on our own house given your site.

Bentleigh Windows & Doors
Armadale Windows & Doors

StickBuild Construction

The Substructure Is What You Are Actually Buying

 Windows & Doors

Decks almost never fail at the board you can see. They fail at the bearer, the joist or the post underneath, which is why we build the same frame regardless of what goes on top of it. Posts sit in galvanised stirrups on poured footings rather than buried in soil, because a post in the ground has a lifespan and it is shorter than yours. Bearers and joists are H3 treated at minimum and H4 anywhere in ground contact, joists run at 450mm centres so the deck never develops that springy feel underfoot, and we leave clearance for airflow underneath instead of boxing it in and creating a damp cavity. Before any of that we look at where water currently runs across the site, because a deck built over ground that already puddles will rot from below whatever the boards cost, and that matters in the low-lying pockets around Elwood more than most people realise. Boards then go down with consistent 3mm to 5mm gaps for drainage and seasonal movement, ends pre-drilled so hardwood does not split, and fixed with either hidden clips or countersunk and plugged screws. Where the height triggers a balustrade we build it to the code requirements: a minimum one metre above the deck surface with no gap that will pass a 125mm sphere.

StickBuild Construction

Why People Call Us Before Replacing a Deck

 Windows & Doors

The most useful thing we do on decking jobs is talk people out of the big one. A deck that sags, feels spongy or has a few soft boards is usually suffering from a problem confined to a handful of members, and replacing those and re-securing the fixings costs a fraction of a rebuild. Our first move on an existing deck is to get underneath it and look, and if the posts and bearers are sound we will say so and price the repair instead. When a rebuild genuinely is the right answer we show you the rot rather than asking you to take our word for it. You get a free site visit the same day you call, an itemised quote splitting boards, substructure and labour, and a carpenter on site within three days of accepting it. Umer Sharif has been building and repairing decks around Melbourne for more than ten years and is on the tools rather than running the job from a phone. Every job carries $20 million public liability insurance under ABN 39 276 982 297. Call 0468 347 781.

Caulfield Windows & Doors
Armadale Windows & Doors

StickBuild Construction

What Decking Costs in Melbourne

 Windows & Doors

Installed decking in Melbourne generally sits between $350 and $650 or more per square metre. Treated pine typically lands near the bottom of that band, merbau a step above, spotted gum and similar dense hardwoods above that again, and premium composite at the top. The figure that surprises people is how little the board actually shifts the total, because footings, bearers, joists and labour cost the same whichever board goes on top, and on a typical deck the boards are well under half the job. Height moves the price far more than timber choice does, since once you are more than a metre off the ground the posts get longer, the footings get bigger and a compliant balustrade is added at its own per-metre rate. Steps, screening and lighting add up faster than people expect, so we itemise them separately and you can take them out. Over ten years the picture changes again, because a merbau deck oiled every year or two carries a real ongoing cost that composite does not, and we give you both numbers so you are comparing the right things. Call 0468 347 781 and we will measure it properly.

StickBuild Construction

Merbau, Spotted Gum, Composite or Treated Pine

 Windows & Doors

Merbau wins on value and it is not close. It is dense enough to wear well, it is available everywhere, and oiled every year or two it will look good for well over a decade. Its downsides are real though, because it bleeds tannin onto paving for the first few months and left uncoated it greys off within a season or two. Spotted gum costs more, is harder and more dimensionally stable, holds its colour noticeably longer, and is what we recommend when someone wants a hardwood deck they will not have to think about as often. Composite is the right answer for exactly one type of owner, the person who knows they will never oil a deck, and for them it is a genuinely good decision despite the higher up-front cost and the heat it picks up in full sun. Treated pine is right for low decks on a budget and for decks that will be painted. Tell us how much maintenance you will realistically do and how the space gets used, and we will recommend the board that fits that answer rather than the one that suits our week.

Caulfield Windows & Doors

Related Concreting Services

Skirting, architraves, reveals and decorative mouldings installed with scribed internal corners and proper mitres, in MDF, pine or solid timber. We match original profiles on period homes rather than fitting the nearest thing available.

Full bathroom and kitchen renovations with the carpentry done by us and every other trade coordinated by us. Strip-out, framing, structural changes, cabinetry and fit-off, with AS 3740 waterproofing certified before a tile goes down.

Solid timber, engineered, hybrid and laminate flooring installed over a subfloor we have actually checked and repaired first. Moisture testing, levelling, squeak and joist repairs, then a floor laid with the expansion gaps it needs.

TESTIMONIALS

What Our Decking Customers Say About Us

The Process

3 Step Process For Your Decking Needs

Same-Day Quote

Call or message us and we visit your site the same day, measuring the job and answering your questions on the spot.

Itemised Pricing

You receive a written quote itemising labour, materials and timber grades, so you see exactly what you are paying for before committing.

Work Starts

Accept the quote and a carpenter is on site within three days, working to agreed dates and clearing debris before we leave each afternoon.

Decking In Caulfield

FREQUENTLY ASKED QUESTIONS

Everything you need to know about our Decking In Caulfield

How much does decking cost per square metre in Melbourne?

Installed decking in Melbourne generally runs between $350 and $650 or more per square metre, and the board you choose is the main driver. Treated pine sits at the bottom of that range, merbau a step above it, spotted gum and other dense hardwoods above that, and premium composite at the top. What people underestimate is that the substructure costs roughly the same regardless of board, so upgrading from pine to spotted gum adds less to the total than the raw board price suggests. Height off the ground moves the figure more than the timber does, because once you pass a metre the posts get longer, the footings get bigger and a compliant balustrade is added at its own per-metre rate. Call 0468 347 781 and we will measure the actual space rather than pricing it off a photo.

How long does it take to build a deck?

A straightforward ground-level deck of around 20 square metres is usually finished in three to five days, of which two to three go on footings and substructure including cure time and one to two on laying boards. Composite is marginally slower to lay than timber because the hidden-clip systems are fussier and the gapping has to be more precise. If we are replacing boards on a substructure that is already sound, the whole job can be done in a day or two. Weather matters more than people expect, because we will not lay hardwood in steady rain or fix boards onto a saturated frame, and we tell you that at quote stage rather than after.

Will a timber deck actually last in Melbourne's weather?

Melbourne is genuinely hard on decking because of the swing between wet winters and hot dry spells, which makes timber move more here than it would in a stable climate. Merbau will give you ten years and comfortably more with regular oiling, and spotted gum will typically outlast it while holding its colour better. Composite will not rot or split, though it does fade and it gets noticeably hot underfoot in full afternoon sun. The bigger factor in every case is the substructure, because a deck almost never fails at the board before it fails at the bearer. That is why we build the frame in H3 and H4 treated timber with proper drainage clearance regardless of which board goes on top.

What does the build process involve from quote to finished deck?

We come out the same day you call, measure the area, check ground levels and look at where water currently runs across the site, then send you an itemised quote with boards, substructure and labour on separate lines. Once you accept, we set out and dig footings, pour them and let them cure, stand posts in galvanised stirrups, run bearers and set joists at 450mm centres, then lay boards with consistent 3mm to 5mm gaps and install steps and balustrade where the height calls for it. Merbau gets its first coat of oil once it has weathered enough to take it, and we tell you when the next one is due rather than leaving you to guess. We clean up at the end of every day and the offcuts leave with us.

Why do deck boards cup, split, grey off or feel spongy underfoot?

A spongy deck is almost always a subframe problem rather than a board problem, usually joists spanning too far, posts set straight into soil without stirrups, or bearers that were never treated to H3 where they needed to be. Cupping is water sitting on one face of a board and not the other, which comes back to gapping and airflow underneath. End splitting is timber drying too fast, often because boards were fixed too close to the end or fastened without pre-drilling. Greying is simply ultraviolet exposure and is cosmetic rather than structural, and it happens to every uncoated timber deck in Melbourne within a season or two. We will tell you which of these actually matters and which you can ignore.

Which decking board should I actually choose?

If budget decides it and you do not mind oiling, merbau is the value pick and it is what most Melbourne decks are built from for good reason. If you want a harder board that holds colour longer and you can spend more up front, spotted gum is the upgrade worth making. If you genuinely will not oil a deck, choose composite and accept the higher up-front cost and the heat underfoot, because an unoiled hardwood deck looks tired within two summers. Treated pine is the right answer for a low deck on a tight budget or for a deck you intend to paint. Be honest about the maintenance you will realistically do, because that single answer decides this more reliably than anything on the spec sheet.

carpentry Caulfield

Request A Free Decking Quote

GET A FREE QUOTE