Reliable Melbourne Carpenters Delivering Quality Workmanship for Residential, Commercial & Insurance Repair Projects.
A bathroom or kitchen renovation is the job where trade coordination decides whether you finish in six weeks or sixteen. StickBuild Construction runs full bathroom and kitchen renovations across Melbourne's south-east, taking the carpentry ourselves and coordinating the plumber, electrician, waterproofer, tiler and plasterer so you are not chasing anyone. We handle demolition and strip-out, framing and noggings for vanities, wall-hung fixtures and future grab rails, structural wall removal where the layout is changing, cabinetry installation and the fit-off that finishes it. Waterproofing is carried out to AS 3740 by the appropriate trade and certified, because it is the one thing you cannot fix later without starting again. We also price the costs competitors leave out, including waste disposal, engineering, building surveyor fees and site protection. Call 0468 347 781 for a same-day site visit.
GET A FREE QUOTE
StickBuild Construction

A bathroom or kitchen renovation is half a dozen trades in a room the size of a car park space, and the carpentry runs through all of it. Our scope covers protection and strip-out, including removal and disposal of the old room; framing and noggings, which is where the fixings for the vanity, the wall-hung pan, the shower screen and any future grab rail get built into the wall while it is open; structural work where the layout is changing, including removing a load-bearing wall and installing a steel beam with engineering; cabinetry and joinery installation; and the fit-off carpentry that closes the room out. Around that we coordinate the plumber, electrician, waterproofer, tiler and plasterer. StickBuild Construction runs these jobs across Melbourne's south-east, and the reason people hand us the whole thing rather than booking trades individually is that a single late trade pushes everything behind it.


StickBuild Construction

The order of a wet-area renovation is fixed and there is no clever way around it: protect and strip out, frame and nog, plumbing and electrical rough-in, waterproof to AS 3740 and let it cure, screed and tile, then cabinetry and fit-off, then final connections. Waterproofing is the point of no return, because it is the only element that cannot be corrected afterwards without taking the tiles off, so we make sure the falls to the waste are correct before the membrane goes down and we do not let anyone compress the cure time to save a day. Alongside the sequence, the thing that decides whether you can live in the house during the job is dust. Bathroom and kitchen strip-outs generate an extraordinary amount of it, and it will migrate into bedrooms and living areas through any gap you leave it. We seal the work area, protect floors and pathways, and clean down at the end of every day rather than at the end of the job.
StickBuild Construction

The two things that go wrong in renovations are trades that do not turn up in the right order and variations that appear on the final invoice. We solve both the same way. The programme is booked as a sequence before we start and we hold the trades to their dates, and you get a short message at the end of each day telling you what happened and who is coming next. On variations, nothing extra gets done without a written price and your written approval, so what turns up behind your old shower is a conversation on the day rather than a line on the bill. Umer Sharif has been running renovation carpentry across Melbourne for more than ten years, and every job carries $20 million public liability insurance under ABN 39 276 982 297. You get a same-day site visit and a start within three days of accepting. Call 0468 347 781.


StickBuild Construction

A full bathroom strip-out and rebuild in Melbourne generally starts in the mid teens of thousands of dollars for a standard room with mid-range fixtures and finishes, and rises with the size of the room, the tile selection, and whether the wet points are moving, since relocating a shower or a toilet means new plumbing in the floor rather than a swap in place. Kitchens have a wider spread again because cabinetry and benchtops dominate the number, so a modest fit-out and a custom joinery kitchen with stone are different orders of magnitude. Where a load-bearing wall is coming out to open a kitchen into a living area, budget roughly $3,500 to $9,000 for the structural work including the engineering certification and the steel beam. The costs that competitors routinely leave off a quote and that we itemise are skip hire and waste disposal, structural engineering fees, building surveyor charges where a permit is required, site protection and dust containment, and making good adjoining rooms afterwards. Every one of those is real money, and finding out about them halfway through is exactly how a renovation blows its budget.
StickBuild Construction

If the layout works and the waterproofing is sound, and the problem is that the room simply looks like 1998, a refresh is dramatically better value than a renovation. A new vanity and tapware, updated lighting, fresh paint and re-grouting will change how a bathroom feels for a fraction of the cost, and in a kitchen, replacing doors and benchtops over sound carcasses is one of the best-value improvements available. If there is any sign of water in the walls or the subfloor, or if the membrane has failed, you are into a full strip-out whether you wanted one or not, because there is no way to reach the waterproofing without removing the tiles. The most expensive decision is moving the wet points, since relocating a shower, bath or toilet means new drainage in the floor and, in an older home on stumps, work under the house as well. Our advice is to move wet points only if the existing layout genuinely does not work, because the cost difference between a rebuild in the same layout and a rebuild in a new one is substantial. We will walk the room with you and tell you which of the three you are actually looking at.


Skirting, architraves, reveals and decorative mouldings installed with scribed internal corners and proper mitres, in MDF, pine or solid timber. We match original profiles on period homes rather than fitting the nearest thing available.

Timber and composite decks built on a substructure designed to outlast the boards: H3 and H4 timber, joists at 450mm centres, posts in stirrups on poured footings. Honest advice on merbau, spotted gum or composite, and a repair quote before a rebuild one.

Solid timber, engineered, hybrid and laminate flooring installed over a subfloor we have actually checked and repaired first. Moisture testing, levelling, squeak and joist repairs, then a floor laid with the expansion gaps it needs.

Call or message us and we visit your site the same day, measuring the job and answering your questions on the spot.

You receive a written quote itemising labour, materials and timber grades, so you see exactly what you are paying for before committing.

Accept the quote and a carpenter is on site within three days, working to agreed dates and clearing debris before we leave each afternoon.
A full bathroom strip-out and rebuild in Melbourne typically starts in the mid teens of thousands of dollars for a standard-sized room with mid-range fixtures, and climbs from there with size, tile choice, and whether wet points are being moved. Kitchens vary even more widely because cabinetry and benchtops dominate the cost, and the range from a modest flat-pack fit-out to custom joinery with stone is enormous. If a load-bearing wall is coming out to open the space up, add roughly $3,500 to $9,000 including the structural engineering and the steel beam. The costs competitors leave off their quotes are waste disposal, engineering fees, building surveyor charges and site protection, and we list every one of them.
A standard bathroom renovation runs about four to six weeks from strip-out to fit-off, and for most of that the room is genuinely unusable. The sequence is fixed and cannot be compressed much: demolition, framing, plumbing and electrical rough-in, waterproofing and its cure time, screed and tiling, then fit-off. Kitchens are usually three to five weeks, and cabinetry lead time is often the constraint rather than the on-site work, so we order early. If you have only one bathroom we will tell you at quote stage exactly which days you will have no shower, so you can plan rather than discover it.
Waterproofing is carried out to AS 3740 by the appropriate trade and certified, and the certificate matters because it is what protects you and any future sale of the house. It is the single item in a bathroom that cannot be corrected later without removing the tiles and starting again, so it is not a place to save money or take shortcuts on cure times. We coordinate it as part of the programme and make sure the falls to the waste are right before the membrane goes down, because a perfect membrane over a floor that ponds is still a bathroom with water sitting in it. You get the certificate with your handover documents.
We do. That is one of the main reasons people engage a carpenter to run a wet-area renovation rather than booking trades themselves. The order is protection and strip-out, then framing and noggings, then plumbing and electrical rough-in, then waterproofing and cure, then screed and tiling, then cabinetry and fit-off, then final plumbing and electrical connection. Every one of those has to happen in that order, and a single trade turning up late pushes everything behind it. We book the sequence, hold the trades to it, and send you a short update at the end of each day so you know what happened and who is coming tomorrow.
Strip-outs on older Melbourne homes regularly reveal something, and the most common finds are water damage to studs and floor structure around the shower, rot in the subfloor under a long-leaking waste, and asbestos-containing sheet in bathrooms and laundries built or renovated before the late 1980s. Asbestos is not something we handle ourselves. If we suspect it, work stops and a licensed removalist is engaged, and we will tell you that upfront rather than mid-job. For everything else, we photograph what we have found, price it, and send it to you for written approval before we continue. Your original quote does not move without your say-so.
If the layout works, the waterproofing is sound and the room is simply dated, a refresh is far better value: new vanity, tapware, lighting, paint and possibly re-grouting will transform a bathroom for a fraction of a full renovation. If the waterproofing has failed, if there is any sign of water in the walls or subfloor, or if you want to move the shower, bath or wet points, you are into a full strip-out whether you like it or not, because you cannot get to any of it without removing tiles. Kitchens are more forgiving, and replacing doors and benchtops on sound carcasses is a genuinely good-value middle path. We will walk the room and tell you which category you are actually in.

GET A FREE QUOTE
BUSINESS
SERVICES
SERVICE AREAS
OPERATING HOURS
Sun: 7:00am - 9:00pm
Mon: 7:00am - 9:00pm
Tue: 7:00am - 9:00pm
Wed: 7:00am - 9:00pm
Thu: 7:00am - 9:00pm
Fri: 7:00am - 9:00pm
Sat: 7:00am - 9:00pm